Installation
Spool holder
The first step of setting up your Ultimaker 2 Go is attaching the spool holder at the back side of the 3D printer. Insert the spool holder in the hole at the back of the Ultimaker 2 Go and push it down until it snaps into place.

Preparing the glass plate
The glass plate, with blue tape applied to it, is the print surface of your Ultimaker 2 Go.
Before installing the glass plate blue tape has to be applied to it. Place strokes of the tape next to each other and make sure they don’t overlap. It’s advised to not put tape on the place where the build plate clamps cover the glass plate.

Installing the glass plate
Now, the glass plate can be installed in the Ultimaker 2 Go. Open up the two build plate clamps at the front side of the build plate with a hex wrench and gently slide the glass plate on the build plate. Make sure it snaps into the build plate clamps at the back and close the clamps at the front to secure it.
Caution: The build plate clamps can be sharp, therefore it is advised to use one of the hex wrenches for opening them.

Power supply
To finish the installation the power supply will be connected. Before connecting it, make sure the power switch is in the “off” position.
Connect one side of the power supply to the wall socket and the other side to the Ultimaker 2 Go. The flat side of the cable connected to the Ultimaker 2 Go needs to point downwards. After this, you can turn the Ultimaker 2 Go on.

-
Ultimaker 3
- Get started
- Operation
-
Maintenance
- Updating the firmware
- Storage and handling of materials
- Maintenance schedule
- Clean the printer
- Lubricate the axles
- Check for play on axles
- Check the tension of the short belts
- Check for residue in the front fan of the print head
- Check the quality of the silicone nozzle cover
- Lubricate the lead screw of the Z motor
- Clean the print cores
- Clean the feeders
- Replace the Bowden tubes
- Troubleshooting
- Downloads
- FAQ
- More support
-
Ultimaker 2+
- Get started
- Operation
-
Maintenance
- Updating the firmware
- Build plate calibration
- Storage and handling of materials
- Hardware maintenance
- Clean the printer
- Lubricate the axles
- Check for play on axles
- Check tension of short belts
- Lubricate the lead screw of the Z motor
- Retighten the hot-end isolator
- Clean the feeder and replace the Bowden tube
- Troubleshooting
- Downloads
- More support
-
Ultimaker Original+
-
Assembly
- Assembly
- What's in the box?
- Preparing the panels
- Assembling the frame
- Attaching various parts
- Sliding blocks
- Attaching the caps
- X and Y axles
- Z stage assembly
- Z stage installation
- Print head assembly
- Print head installation
- Aligning the print head
- Feeder assembly
- Bowden tube
- Spool holder
- UltiController
- Mounting the main board
- Connecting
- Electronics cover
- First use
- Printing
- Maintenance
- Troubleshooting
- Additional information
-
Assembly